Every job below is one we do ourselves across Glendale.
We build new decks from the footings up, sized for your yard and the load you actually plan to put on it, furniture, a hot tub, a grill station. Framing comes first: posts, beams, and joists spaced and braced for the span, then decking on top. On sloped Glendale lots, post height and footing depth get engineered for the actual grade, not a flat-lot default.
We draw the layout around how you use the yard, not a stock rectangle. That includes stair placement, railing style, and whether the deck steps down in levels to follow the slope instead of fighting it. You see a plan before any wood gets ordered.
Soft or bouncy decking usually means a joist has rotted or a hanger has rusted through, and we replace what's failed instead of just capping it with new boards. We check the ledger board connection to the house first, since that's the point most decks actually fail at. Railings that wobble get re-bolted or rebuilt to meet the 36-inch minimum height code calls for.
Sun in this valley fades and dries out wood fast, and once the grain opens up water gets in and the boards start to cup. We clean, sand, and seal the decking every year or two depending on sun exposure, which is the single thing that extends the life of a wood deck the most.
Composite boards like Trex or TimberTech don't need staining and don't splinter, which matters if you want a deck you're not maintaining every summer. We still build the frame the same way, proper joist spacing and hidden fastener clips so the boards lie flat and the gaps stay even.
We build and repair railings to the height and baluster spacing building code requires, 36 inches minimum and no gap wider than 4 inches between balusters. Loose posts usually mean the blocking behind them has failed, and we fix that, not just the post.
If the frame underneath is still sound but the boards are cracked, gray, or splintering, we tear off just the decking and replace it without rebuilding the structure. It's a faster, cheaper option than a full rebuild when the framing passes inspection.
Old decks get torn out board by board, nails and screws pulled, lumber hauled off site. If you're replacing a deck we can usually demo and start the new footings within the same week.
We add shade structures over existing or new decks, built to tie into the same posts and beams rather than sitting as a separate structure. Worth it if your deck faces west and gets afternoon sun most of the year.
On steep lots we step the deck down in stages instead of building one tall platform, which cuts down on railing height and stair runs. Each level gets its own footings and beams sized for that section's span.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
Deck construction and repair across these communities.
Questions that come up once a deck project is underway.
Describe the problem and we will tell you what it probably is. No obligation.